News
BREAKING: FG Completes Second Niger Bridge
The Minister of Works and Housing, Babatunde Fashola, on Wednesday, confirmed that the construction of the 2nd Niger bridge is now completed and will soon be released to the public for use.
He stated this at an ongoing press briefing to present the President, Major General Muhammadu Buhari’s (retd.) scorecard in Abuja.
According to him, the only factor delaying the commissioning of the road is the construction of the link road which the recent surge of flooding has impeded.
He said, “I can confirm that the second Niger bridge itself is finished. People can walk through the bridge now unimpeded. What remains is the four-kilometer link road on the Asaba side.
“Right now, our dredger is in place, we have to rebuild the road by reclaiming sand, the recent surge of flood has slowed us down. On the Onitsha side, there is a 7kilometer road that links the bridge and the Onitsha-Owerri interchange.” Punch
-
News4 days agoOsun 2026: Action Alliance Elects Farinloye As Governorship Candidate, Pledges People-Centred Governance
-
News4 days agoFRSC To Prosecute Peller After Crash
-
News3 days agoOsinbajo, Adeleke, Aregbesola Inaugurate N34bn UNIOSUN Medical Research And Training Hospital
-
News5 days agoNigeria’s Swift Benin Intervention, Detention of Air Force Personnel in Burkina Faso Spark Controversy

